Welcome to the Inert Ordnance Collectors.
Page 2 of 2 FirstFirst 12
Results 11 to 12 of 12
  1. #11
    Premium Member
    Join Date
    May 2015
    Location
    Southend on Sea
    Posts
    613
    Thanks
    828
    Thanked 737 Times in 284 Posts
    Both the Test Set Demolition and the Box Testing and Jointing contain half a pound of old linen cloth. The point is made that all connections have to be clean, both the terminals and the cable or peg ends. This is particularly essential where small resistances are being tested.

  2. #12
    Junior Member
    Join Date
    Jun 2018
    Location
    Canada
    Posts
    27
    Thanks
    1
    Thanked 17 Times in 7 Posts
    Thanks again AE501! I thought that might be what its for but it was a lot of cloth.

 

 
Page 2 of 2 FirstFirst 12

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Back to top