satan18
Well-Known Member
Another stage done on the 250 which involved de rusting the case
and drilling and re taping the nose plug,which was well and truly squashed
in and took me two hours.
Next came a good coat of Red etch primer to hold back the rust.
This is about as far as it goes for the moment as i am waiting for a genuine fuse pocket to weld back in to place.
Still looking for tails for this and will try and source some soon.
Best phil
and drilling and re taping the nose plug,which was well and truly squashed
in and took me two hours.
Next came a good coat of Red etch primer to hold back the rust.
This is about as far as it goes for the moment as i am waiting for a genuine fuse pocket to weld back in to place.
Still looking for tails for this and will try and source some soon.
Best phil